Products used:
FreedomTuff 6160 Epoxy Primer
FreedomTuff 2202 Polyurea
FreedomTuff 6600 MVR Epoxy Primer
Project description: Westfield is doing a $750 million expansion on their Topanga Canyon mall. One part of the expansion includes building an underground tunnel from a main road under shopping area to a parking structure. Freedom worked closely with Westfield to design and spec a waterproofing system that would last and speed up the construction of the project.
Application: Westfield had a tunnel they need to move cars from a busy street under the mall to a parking garage. The total surface are of the tunnel was 50,000 +. They were going to be pouring in sections and needed to be able to apply a waterproofing system on some areas in less than 28 days of the pour. For these areas that were older than 7 days of cure but less than 28 days of cure we used 16 mils of FT-6600 MVR. After the primer was applied a total of 120 mils of FT-2202 polyurea was applied. A “belt & suspenders” approach was used so drain board was hung on top of the polyurea to help move the water away from the walls and ceiling.
Results: The polyurea system was chosen due to its durability, seamless application, fast turnaround time, and extremely low permeability rating. The owner Westfield was able to hand the drain board the same day the polyurea was sprayed and back fill the areas the next day. This helped speed up the construction path by several weeks saving money on the construction cost.
Gallery
The FreedomTuff® product line is a revelation of what Polyureas, Polyurethanes, Polyaspartics and Epoxies are about. When so many products have been “made” for maximum impact, at Freedom® Chemical Corporation we’ve been content to let our products speak quietly. No need to shout when you have something special to say.
Recent Case Studies & Applications
Winters – Schram Associates
Contractor: Innovative Painting & Waterproofing
Job description: green roof – 5000 sq.ft. 10$ mm malibu home
UCI Humanities Hall
Sub Contractor: Innovative Painting and Waterproofing
Job description: Podium Deck Waterproofing
Pilgrim’s Pride
Consultant: D7 Consulting – Joe Daniels
System: FreedomTuff® Guardian-WF™
Los Angeles Music Center
Consultant: D7 Consulting – Joe Daniels
System: FreedomTuff® Guardian-WF™
Elevate 5504 Harbor Blvd
Consultant: D7 Consulting – Joe Daniels
Job description: Waterproofing
Dolphins at Long Beach-CA Port
Client: Structural - City of Long Beach
Sub-Contractor: Mark Beamish Waterproofing