Products used:
Guardian-Containment
Freedomtuff™ 2202 polyurea
Geotextile Fabric
Project description: in 2011 the bureau of reclamation was installing new electrical sub stations at davis dam in arizona. The sub stations are used to collect and distribute power generated at the dam. The transformers for the sub stations hold oil for cooling so a secondary containment was required incase the units leaked. Exposure to extreme temperature swings and chemical resistance to the oils were special considerations for the coating selection.
Application: freedomtuff™ 2202 polyurea was chosen as the membrane since its phyisical properties provide flexibility across varying temperature ranges seen the in desert. The membrane would have to be installed over loose soil so an 8 oz geo fabric was used as a substraight. Then freedomtuff™ 2202 polyurea was applied at 100 mils . Per freedoms recommendations, ¼” keyway terminations were used in areas over concrete. Consideration was given to the rapid and extreme temperature swings. Therefore, appropriate slack was left to accommodate for expansion and contraction of the coating system.
Results: the selection of the freedomtuff™ 2202 polyurea over the geo fabric left the owners with a durable and seamless secondary containment membrane. The system has seen 2 full summers of arizona’s extreme temperatures and has shown no signs of premature failure.
Gallery
The FreedomTuff® product line is a revelation of what Polyureas, Polyurethanes, Polyaspartics and Epoxies are about. When so many products have been “made” for maximum impact, at Freedom® Chemical Corporation we’ve been content to let our products speak quietly. No need to shout when you have something special to say.
Recent Case Studies & Applications
City of Toronto – Gardiner Expressway Phase 2
Client: City of Toronto
Sub-Contractor: Bridge Tite Group
Amusement Park
Contractor: Innovative painting & waterproofing
Job description: Waterproofing for underwater ride
Tetra Technologies Inc – Louisiana
Job description: holding tanks for drilling fluids
Westfield
Contractor: JP Rodriquez
Job description: 24 Hour Fitness pool deck and sports court
Cronin Farms
Contractor: midwest coatings – dustin reynolds
Job description: truck wash bay
Great Park
Sub Contractor: Mark Beamish Waterproofing
Job description: New Construction Project