Case Studies & Applications
Stadiums
Baseball, Football and Soccer stadiums provide adverse conditions. Freedom’s systems offer highly durable, quick return to service and decorative finishes to the likes of the LA Dodgers.
University of California Los Angeles – California
Job description: cooling towers
Traffic Coatings
Waterproofing a parking garage has its challenges. Coatings should endure movement from both cyclic weathering and flexing from heavy traffic. Freedom has solutions to meet the challenges faced with these daunting requirements. (NCB Universal parking garage Guardian Deck)
Guardian-MR™
FREEDOMTUFF® GUARDIAN-MR for use in mechanical rooms is an integrative group of coatings utilizing an epoxy primer and a hand applied two component polyurethane that provides an elastomeric waterproof coating.
Cronin Farms
Contractor: midwest coatings – dustin reynolds
Job description: truck wash bay
GuardianDeck™
FREEDOMTUFF® GUARDIANDECK™ is an integrative group of coatings utilizing an epoxy primer, spray applied FreedomTuff® 2190 polyurea, FreedomTuff® 4300 and FreedomTuff® 4000 that are hand applied two component polyurethanes and polyaspartics providing a protective and elastomeric waterproofing vehicular/traffic coating. These coatings are 100% solids, solvent free and odorless, forming a continuous seamless membrane
ADVANTAGES
- Can withstand constant water immersion
- Meets USDA criteria
- No noxious odors
- Excellent chemical resistance
- USGBC LEED, EQ Credit 4.2 AND 4.3: Low-emitting VOC Compliant Materials
USE
- Beverage/Food Processing Plant/Cold Storage Facilities
- Flooring
- Walls and Floors
APPLICATION
Throughout the application the sanded surface must be clean and dry. For optimum results proceed with application while air and substrate temperatures are between 32º F (0° C) and 104° F (40° C) 6º (-14.44º C) above the dew point and rising.
STEP ONE:
The substrate may require more than one coat of FreedomTuff® primer. After selection of primer, mix and immediately pour primer onto the substrate at a rate of 100 to 200 square feet per gallon (9.29030m² to 18.5806m² per liter) in enough quantity to obtain a minimum theoretical dry film thickness of 8 mils (203.2 microns) per coat.Apply polyurea coating over primer within eighteen (18) hours. If not coated within the time allotted, contact Freedom® Chemical orporation.
Allow Step One (1) primer to become tack free prior to application of FreedomTuff® polyurea.
STEP TWO:
Prior to application of FreedomTuff® polyurea precondition both Part-A and Part-B to 75º F (23.88º C) – 80º F (26.66º C) before applying. Adequately blend FreedomTuff® polyurea Part-B (Resin) making sure not to encapsulate any air until the mixture and color is consistent. Fit Part-A with a desiccant drying device.
Apply FreedomTuff® polyurea using a plural component, high pressure 1:1 ratio heated, spray equipment.
Proportioner Conditions:
- Capacity minimum 20 lbs. per minute
- Static pressure 2800 – 3000psi
- Spraying pressure 2500psi minimum
- Pressure balance 100 variance desirable
- 300 psi variance maximum
- Temperatures preheaters & hose 170º F (76.66º C) each
Spray apply FreedomTuff® polyurea at a minimum of 4 (15.14165 liters) to 6.25 gallons (23.65882 liters) per 100 square feet (9.290 m²) to the substrate, to achieve a theoretical dry film thickness between 64 mils (1625.6 microns) to 100 dry mils (2540 microns) over the entire surface. FreedomTuff® polyurea should be sprayed in a smooth pattern, to establish uniform thickness and appearance (crosshatch pattern). Re-coat FreedomTuff® polyurea within 0 – 6 hours of previous coat.
The FreedomTuff® product line is a revelation of what Polyureas, Polyurethanes, Polyaspartics and Epoxies are about. When so many products have been “made” for maximum impact, at Freedom® Chemical Corporation we’ve been content to let our products speak quietly. No need to shout when you have something special to say.








